Farm Buildings, Gloucestershire

CLIENT:  Private Client

CONTRACTOR:  Self-Build

GDV:  £1m

NO OF UNITS:  Five Barn Conversions and Works to Existing Farmhouse

DESCRIPTION OF PROJECT:

Five barn conversions forming a collection of bespoke holiday accommodation and a central events space, together with works to the existing listed farmhouse.

OUR INVOLVEMENT:

Working closely with the Investor, we prepared a detailed cost plan giving confidence that the project was feasible.

Gloucester.jpg
Holburne Park - Bath

CLIENT:  Hardrock Developments Limited

CONTRACTOR:  BECT

DURATION:  5 Years

GDV:  £150m

NO OF UNITS:  198

DESCRIPTION OF PROJECT:

Designed by leading classical Architect Robert Adam (Duchy of Cornwall - Poundbury), Holburne Park, situated in the World Heritage Centre of Bath, consists of 198 high end Bath Stone town houses and villas. Set in challenging topography with formidable substructure solutions on a slope that extends aggressively down to the picturesque Kennet and Avon Canal, the site provides a combination of inspirational luxury aside a demanding build.

OUR INVOLVEMENT:

We are Professional Quantity Surveyors on this project providing programme appraisal, monthly cost advice, Board reporting and Contractors Certification for payment/control administration.

Bath Aerial for Slicing.jpg
Site in Essex - Coming Soon

CLIENT:  Mulberry Property Developments Limited

DURATION:  2 Years

GDV:  £15m

NO OF UNITS:  43

DESCRIPTION OF PROJECT:

Situated in a thriving town and bounded on two sides by open space, these 43 units will be formed on two plateaus created by the infilling of two former fishing lakes. Sympathetic use of the site’s ground conditions and landscaping, coupled with award winning design have resulted in the start of a successful looking journey.

OUR INVOLVEMENT:

Ideally suited with our groundworks and civils experience, we provide general developer surveying and materials purchasing duties.

 

Responsible for all programme, administration and payment for works carried out, along with cost control, project planning and commercial subcontract and procurement management.

Site in Essex.jpg
The Quarry - Erith

CLIENT:  Erith Hills LLP

DURATION:  8 Years

GDV:  £254m

NO OF UNITS:  850

DESCRIPTION OF PROJECT:

850 highly desirable units built on challenging topography. A highly sloping site overlain by 28m of variable fill, this site became the case study for the standards defined in the Definition of Waste Code of Practice: DoWCoP.

OUR INVOLVEMENT:

Initially responsible for building the LLP from its inception at our last company, our involvement post-Anderson has been appraisal, commercial reporting and a continuing advisory role as both Client’s and Contractor’s Surveyor and Project Managers.

EQ_Aerialreside.jpg
Commissioners Road - Strood

CLIENT:  Vistry Partnerships - London Developments

DURATION:  5 Years

GROUNDWORKS PACKAGE VALUE:  £6.6m

NO OF UNITS:  123

DESCRIPTION OF PROJECT:

123 units built over and in a partially filled quarry culminating in challenging ground conditions with high end specification requirements.

OUR INVOLVEMENT:

We were contracted to provide high level cost and time cost plans and reviews of key ground abnormalities and ground works for land appraisal and bid purposes.

CPC - Strood.png
Lime Wood Primary School - Erith

CLIENT:  London Borough of Bexley

CONTRACTOR:  Erith Hills LLP

DURATION:  2 Years

GDV:  £18m

600 Place, 3 Form of Entry, Primary School

DESCRIPTION OF PROJECT:

Circular in shape, Lime Wood Primary Free School was designed as an exemplar space in which 600 students can thrive. It’s use of concrete, timber and expansive glass is an echo to the historic quarry and tree belt that the school now resides on.

OUR INVOLVEMENT:

Historic work within our time with Anderson’s from inception to clad frame, has since been taken on by us through appraisals, subcontract and project management. Particularly enjoyable has been teaching basic construction to Lime Wood’s existing pupils.

Limewood school.png
Wrestwood Road - Bexhill-on-Sea

CLIENT:  Vistry Partnerships - London Developments

DURATION:  3.5 Years

GROUNDWORKS PACKAGE VALUE:  £7.4m

NO OF UNITS:  249

DESCRIPTION OF PROJECT:

Construction of 249 properties on a sloping site with major retaining walls and earthworks at Bexhill-on-Sea, Kent. Contained within a larger strategic construction project.

OUR INVOLVEMENT:

We were contracted to provide a complete groundworks measure and budget for all substructure costs along with the identification of likely drainage and services routes. This was supplied along with an understanding of both the timeline and conditions surrounding the earthworks cut, fill and retaining wall construction.

DCZ-1-201b-Bexhill-Tenure-30 percent_edited.jpg
Parcel 14 - Cheshunt Lakeside

CLIENT:  Inland Homes Limited

DURATION:  53 Weeks

GDV:  £7m

NO OF UNITS:  22

DESCRIPTION OF PROJECT:

Construction of 22 residential properties built in one block over a commercial space with accompanying external works.

OUR INVOLVEMENT:

We prepared a cost plan for the works with build programmes and a review analysis on revenue, specification and commercial work to date.

Pages from RM Planning Drawings - combined file.jpg